MODULE 04 / PRODUCTION PREPARATION
Give the shop a package with a clear revision and release owner.
Prepare production orders, material lists and work documents from the reviewed job information.
FOR / Engineering · Production planning
THE EVERYDAY BOTTLENECK
Prepare the next team to build.
Production gets a folder of drawings, a separate material list and a late change by email. Someone has to reconcile the package before work can begin.
One revision. One package.
- production order / canopy frameA
- Material list / canopy packageA
- Revision summary / width changeA
WHAT COMES IN
A defined starting point.
- ↳Reviewed drawings and job requirements
- ↳Fabrication rules and document templates
- ↳Revision and release criteria
WHAT MOVES FORWARD
A reviewable deliverable.
- production orders for the selected product family
- A material list and package index
- Revision references and release checks
THE HUMAN CHECKPOINT
The decision stays
with your team.
Your production or engineering lead checks completeness and approves release. A prepared package is not automatically an authorized work order.
What we define in scope
Document formats and fabrication logic are agreed in scope. ERP, inventory and delivery connections are separate options that require evaluation.
YOUR NEXT HANDOFF
Let’s talk about production preparation.
A 20–30 minute conversation with our team about your process, your bottleneck and a focused first scope.